0102030405
News

The New Year Holiday Has Ended And Work Has Resumed
2025-02-12
The happy Spring Festival holiday has ended, and our factory has started working fully!
view
detail

The filling water line required by the customer has been sent to Brazil
2025-01-22
This week, the water production line equipment for our Brazil customer have been shipped.
view
detail

The customer from Congo has come to inspect the goods
2025-01-16
This week, our customer from Congo came to the factory to inspect the machines, and the entire set of equipment is about to be sent to Congo.
view
detail

Bottled Water And Bottled Carbonated Beverage Line Equipment Sent To Nigeria
2025-01-07
This week, the water bottling line and Bottled carbonated beverage linecustomized for our Nigerian customer have been shipped.
view
detail

Ghanaian customers come to visit and purchase bottled water production line
2024-11-25
Recently, Ghanaian customers came to Proman Machinery Co., Ltd. for visit and product investigation, and discussed follow-up cooperation. The main purpose of this visit is to investigate the manufa...
view
detail

10000 bottles per hour of bottled water production line equipment sent to Ethiopia
2024-11-25
This week, the 10000 bottles per hour of bottled water production line equipment for our Ethiopia customer have been shipped.We have separate quality control department, which make sure the raw mat...
view
detail

The air drag 3 in 1 filling machine for the Ethiopian customer has been completed
2024-11-25
This week, we have completed the customized air drag 3 in 1 filling machine for our Ethiopian customer.The model will be cleaned by filling and sealing. This is a good choice for the production of ...
view
detail










