0102030405
News

The filling water line required by the customer has been sent to Brazil
2025-01-22
This week, the Water Production Line equipment for our Brazil customer have been shipped.
view detail 
The customer from Congo has come to inspect the goods
2025-01-16
This week, our customer from Congo came to the factory to inspect the machines, and the entire set of equipment is about to be sent to Congo.
view detail 
Bottled Water And Bottled Carbonated Beverage Line Equipment Sent To Nigeria
2025-01-07
This week, the Water Bottling Line and Bottled carbonated beverage linecustomized for our Nigerian customer have been shipped.
view detail 
Ghanaian customers come to visit and purchase bottled water production line
2024-11-25
Recently, Ghanaian customers came to Proman Machinery Co., Ltd. for visit and product investigation, and discussed follow-up cooperation. The main purpose of this visit is to investigate the manufa...
view detail 
10000 bottles per hour of bottled water production line equipment sent to Ethiopia
2024-11-25
This week, the 10000 bottles per hour of bottled water production line equipment for our Ethiopia customer have been shipped.We have separate quality control department, which make sure the raw mat...
view detail 
The air drag 3 in 1 filling machine for the Ethiopian customer has been completed
2024-11-25
This week, we have completed the customized air drag 3 in 1 Filling Machine for our Ethiopian customer.The model will be cleaned by filling and sealing. This is a good choice for the production of ...
view detail 









